Service Description: These layers represent the Transcontinental Gas Pipeline Co. – Northeast Supply Enhancement Project GIS data as disseminated by the NJDEP Division of Land Resource Protection.
On November 7, 2025, the NJDEP Division of Land Resource Protection approved permits for the Transco NESE project. Specifically, the Division approved a Freshwater Wetlands Individual Permit, Coastal Wetlands Permit, Flood Hazard Area Individual Permit, Flood Hazard Area Veri cation, In-Water and Upland Waterfront Development Permits and a Water Quality Certi cate. <a href="transco-nese-permit-approval-dlrp-file-no.-0000-25-0012.1-lup-250001.pdf">View the permit decision</a>.
The NESE Project is a proposed expansion of Transco’s existing system from Pennsylvania through New Jersey to New York, to provide 400,000 dekatherms per day (Dth/d) of incremental capacity to Transco’s existing Rockaway Transfer Point located approximately three miles offshore of the Rockaway Peninsula in Queens Borough, New York. The regulated portions of the proposed NESE project would involve the construction and installation of three components in New Jersey: (1) construction of a new gas- red compressor station (CS 206) with connecting discharge piping (2) the Madison Loop, and (3) the Raritan Loop (offshore). Please see below links for the permit plan cover sheets depicting the Project facilities. For awareness, in Pennsylvania, the Project includes 10.1 miles of 42” diameter pipeline as well as upgrades to Transco’s existing compressor station 200.
NOTE: These GIS data were downloaded by the MARCO Portal, 11/25/2025, for visualization purposes on the Portal and are presented as-is. For the original NJDEP GIS data and official permit information, documents, and notices, please go to the NJDEP Transcontinental Gas Pipeline Co. – Northeast Supply Enhancement Project webpage: <a href="https://dep.nj.gov/nese/#gis-site-plans">https://dep.nj.gov/nese/#gis-site-plans</a>.
Map Name: MapPREP
Legend
All Layers and Tables
Dynamic Legend
Dynamic All Layers
Layers:
Description: These layers represent the Transcontinental Gas Pipeline Co. – Northeast Supply Enhancement Project GIS data as disseminated by the NJDEP Division of Land Resource Protection. On November 7, 2025, the NJDEP Division of Land Resource Protection approved permits for the Transco NESE project. Specifically, the Division approved a Freshwater Wetlands Individual Permit, Coastal Wetlands Permit, Flood Hazard Area Individual Permit, Flood Hazard Area Veri cation, In-Water and Upland Waterfront Development Permits and a Water Quality Certi cate. <a href="transco-nese-permit-approval-dlrp-file-no.-0000-25-0012.1-lup-250001.pdf">View the permit decision</a>.The NESE Project is a proposed expansion of Transco’s existing system from Pennsylvania through New Jersey to New York, to provide 400,000 dekatherms per day (Dth/d) of incremental capacity to Transco’s existing Rockaway Transfer Point located approximately three miles offshore of the Rockaway Peninsula in Queens Borough, New York. The regulated portions of the proposed NESE project would involve the construction and installation of three components in New Jersey: (1) construction of a new gas- red compressor station (CS 206) with connecting discharge piping (2) the Madison Loop, and (3) the Raritan Loop (offshore). Please see below links for the permit plan cover sheets depicting the Project facilities. For awareness, in Pennsylvania, the Project includes 10.1 miles of 42” diameter pipeline as well as upgrades to Transco’s existing compressor station 200.NOTE: These GIS data were downloaded by the MARCO Portal, 11/25/2025, for visualization purposes on the Portal and are presented as-is. For the original NJDEP GIS data and official permit information, documents, and notices, please go to the NJDEP Transcontinental Gas Pipeline Co. – Northeast Supply Enhancement Project webpage: <a href="https://dep.nj.gov/nese/#gis-site-plans">https://dep.nj.gov/nese/#gis-site-plans</a>.
Copyright Text: GIS data published by the NJ Department of Environmental Protection (NJDEP)
Spatial Reference:
26918
(26918)
Single Fused Map Cache: false
Initial Extent:
XMin: 546230.7323778381
YMin: 4451644.102740509
XMax: 606684.8286690509
YMax: 4512952.673890961
Spatial Reference: 26918
(26918)
Full Extent:
XMin: 533394.5234637489
YMin: 4472229.149493892
XMax: 597486.0499353616
YMax: 4503681.4566586055
Spatial Reference: 26918
(26918)
Units: esriMeters
Supported Image Format Types: PNG32,PNG24,PNG,JPG,DIB,TIFF,EMF,PS,PDF,GIF,SVG,SVGZ,BMP
Document Info:
Title: Transcontinental Gas Pipeline Co. – Northeast Supply Enhancement Project GIS Data Layers (NJDEP)
Author:
Comments: These layers represent the Transcontinental Gas Pipeline Co. – Northeast Supply Enhancement Project GIS data as disseminated by the NJDEP Division of Land Resource Protection. On November 7, 2025, the NJDEP Division of Land Resource Protection approved permits for the Transco NESE project. Specifically, the Division approved a Freshwater Wetlands Individual Permit, Coastal Wetlands Permit, Flood Hazard Area Individual Permit, Flood Hazard Area Veri cation, In-Water and Upland Waterfront Development Permits and a Water Quality Certi cate. <a href="transco-nese-permit-approval-dlrp-file-no.-0000-25-0012.1-lup-250001.pdf">View the permit decision</a>.The NESE Project is a proposed expansion of Transco’s existing system from Pennsylvania through New Jersey to New York, to provide 400,000 dekatherms per day (Dth/d) of incremental capacity to Transco’s existing Rockaway Transfer Point located approximately three miles offshore of the Rockaway Peninsula in Queens Borough, New York. The regulated portions of the proposed NESE project would involve the construction and installation of three components in New Jersey: (1) construction of a new gas- red compressor station (CS 206) with connecting discharge piping (2) the Madison Loop, and (3) the Raritan Loop (offshore). Please see below links for the permit plan cover sheets depicting the Project facilities. For awareness, in Pennsylvania, the Project includes 10.1 miles of 42” diameter pipeline as well as upgrades to Transco’s existing compressor station 200.NOTE: These GIS data were downloaded by the MARCO Portal, 11/25/2025, for visualization purposes on the Portal and are presented as-is. For the original NJDEP GIS data and official permit information, documents, and notices, please go to the NJDEP Transcontinental Gas Pipeline Co. – Northeast Supply Enhancement Project webpage: <a href="https://dep.nj.gov/nese/#gis-site-plans">https://dep.nj.gov/nese/#gis-site-plans</a>.
Subject: These GIS data layers represent the Transcontinental Gas Pipeline Co. – Northeast Supply Enhancement Project GIS data as disseminated by the New Jersey Department of Environmental Protection (NJDEP). The 5 GIS data layers formatted as Esri shapefiles published and disseminated by the NJDEP are 1) NJ_NESE_Workspace_v2.shp, 2) NJ_NESE_LOD_v24b.shp, 3) NJ_NESE_Centerline_v24b.shp, 4) NJ_NESE_AccessRoad_v24b.shp, and 5) NJ_NESE_Mileposts_v24b.shp.
On November 7, 2025, the NJDEP Division of Land Resource Protection approved permits for the Transco NESE project. Specifically, the Division approved a Freshwater Wetlands Individual Permit, Coastal Wetlands Permit, Flood Hazard Area Individual Permit, Flood Hazard Area Veri cation, In-Water and Upland Waterfront Development Permits and a Water Quality Certi cate. View the permit decision.
The NESE Project is a proposed expansion of Transco’s existing system from Pennsylvania through New Jersey to New York, to provide 400,000 dekatherms per day (Dth/d) of incremental capacity to Transco’s existing Rockaway Transfer Point located approximately three miles offshore of the Rockaway Peninsula in Queens Borough, New York. The regulated portions of the proposed NESE project would involve the construction and installation of three components in New Jersey: (1) construction of a new gas- red compressor station (CS 206) with connecting discharge piping (2) the Madison Loop, and (3) the Raritan Loop (offshore). Please see below links for the permit plan cover sheets depicting the Project facilities. For awareness, in Pennsylvania, the Project includes 10.1 miles of 42” diameter pipeline as well as upgrades to Transco’s existing compressor station 200.
NOTE: These GIS data were downloaded by the MARCO Portal, 11/25/2025, for visualization purposes on the Portal and are presented as-is. For the original NJDEP GIS data and official permit information, documents, and notices, please go to the NJDEP Transcontinental Gas Pipeline Co. – Northeast Supply Enhancement Project webpage: https://dep.nj.gov/nese/#gis-site-plans.
Category:
Keywords: pipeline,NESE,Raritan Bay
AntialiasingMode: Fast
TextAntialiasingMode: Force
Supports Dynamic Layers: true
MaxRecordCount: 2000
MaxImageHeight: 4096
MaxImageWidth: 4096
Supported Query Formats: JSON, AMF, geoJSON
Min Scale: 0
Max Scale: 0
Supports Datum Transformation: true
Child Resources:
Info
Dynamic Layer
Supported Operations:
Export Map
Identify
QueryDomains
Find
Return Updates